Monday, December 23, 2013

Acknowledgement

 I would like to express the deepest appreciation and thanks to all the studiomaster that different major who has shown the attitude and the substance of a genius. Without their supervision and constant help,i think i will give up in the early stage.They give me many of idea on how to produce the project that have quality and make me improve in my drawing technique .
 Secondly,i wound like to thanks my friend that give me fully support when i feel want to give up and give the fully cooperation when grouping done the project.I hope that our friendship never last although the student will be separated in two group that is design student and non-design student.
  Lastly,i would like to thanks to my family member on take care of me and make call with me although they are busy on their work.Their  little greeting is enough to melt my heart and give me strong to face any problem when doing the project .They will always give me support and give me the comfort situation to let me relax.Without them,i never continue my education until now and lead me to the right way.I love you all.
   

Sunday, December 22, 2013

Essay

   When I first time be in touch with RUS 104 project ,i scared and i feel i want to apply for other school.This is because  I have no idea on how to drawing and i no interest in drawing.But i tell myself ,i never easy give up and i try to draw myself in the sketch book.Finally,i draw out myself in project 1a .Although that is not nice,but i satisfy what i draw because i already try my best and that is full of my effort. I am happy because my project 2a and 2b also have been selected in exhibition and it give me to be sure and continue improve myself  In the studio,i have learn many thing on the technique how to draw.Besides that,i notice that when the project is doing by grouping ,that is not easy because need to manage well in time to make sure all the member can attend.Moreover ,the attitude for each other is different so we need to communicate well to make the work easy.This give me sense that we need to tolerance when work at outside.    From this studio,i know many friend and they play a important role because they can teach me when i have problem and make me never lost the way.This friendship i hope that it never last and can be forever. HBP have the name that call "Hantu Balik Pagi ",that is really and always lack of sleep.Sometimes I cry and wonder how  the studio life make me crazy and feel want to run out from studio.But once the first sem is gone to finish,i miss the studio life again.Haha,finally i get the answer because studio give us learn many thing on creativity , sustainable , friendship and the real life .Once finish one project,we will feel satisfy because that project is full of memory when process the project from nothing to something.     On the Langkawi trip, Construction Management that is my major never give cooperation and make our studiomaster disappointed.So,we practice and give full of cooperation in project 8 to get back the lecturer' identity and finally ,our drama and dance have get the award and studiomaster happy with the work and thumb up.We know that unite will make the thing perfect.     I appreciate what have been learn in studio RUS 104 and will apply it when i going outside get the job.Let say goodbye to RUS104 and welcome the RUS 105 in my next sem.^^

Project 8

My major is construction management. So our major is get the theme of  Kerajaan Demak.We all wear the custom that suitable for Kerajaan Demak .Our major have two performance that is one for dance and one is for drama. I enter drama part and that is enjoy and bring so much of fun.


The day that having the performance night and we are taking the photo infront of the drawing that done by some architect design student.They are really amazing.


The day we all rehearsal at the DK to make the drama more natural and success.When rehearsal,that is full of funny and i feel that unite will make the performance success.






Project 7

Project 7 is about the exhibition at the drum .The theme of the exhibition is "floating line".That mean all the thing need to hang up.In this exhibition,all the major studiomaster will choose the best project between the own major member and display when exhibition day.I very glad because my projet have been selected.

 This design is make by the committee member in the drum.

 The day when exhibition and the yellow banner is my major banner.

 The wall also design by the committee member and we all are waiting the studiomaster and the dean to enter the drum.



Project 6C

In project 6c, all group need to construct the stage in two week .Our group spend around
 RM 1300+ on our stage .That quit expensive but what we produce,we very satisfy on our effort. We even no sleep well in everyday to think and design the stage.Our stage have the pond as the base,so the pond we have put the fish to produce the natural environment and more peaceful.



Under the pond,we write our group name that is DiversOne and our concept to construct this stage is Echo Of Silence.

 Our stage is present the Wayang Kulit show to make the satge more interest. All the equipment all is done by our group member .

 This is produce by the design team member.




When the stage is open with all the lighting,that produce the feel of romance and beauty.I like our design because it full of our effort and that is special for me.

Thursday, November 28, 2013

Sketching part



This architectural lettering is learn on the first lecture.That time,i feel that this kind of letter is tough for me to write well.But after practice,I have been improved my technique of writing.
In project 1a,the project require us to draw myself.This is my first time drawing,even it look ugly,but it meaningful to me on my effort.


This is the way i create my logo. First,the Ching represent the last of my name. Second,I add the wave to show that my name have been occured on the ocean.Third, I use letter"i" represent the sun.Finally,i use letter"c" to draw the tree.My logo show that I come from Penang and study at Penang .



I sketch this when receive the project 4 .This is the axonometric drawing.



This is the one point perspective drawing.




At Dataran Lang,i feel that eagle is the most interesti
ng for me to sketch.Although my drawing is not good,but i satisfy the drawing i proceed.

When i at the Beras Basah Island,i sketch the coconut tree.


 This have been sketch on study week.I tell myself never give up when met the problem and challenge until the end to get the champion.



I use drawing pen to sketch this house.It is simple,but i satisfy.

Fotolog



The photo is taken when we are going for the academic trip at Pulau Langkawi
Dataran Lang Eagle

Chapture the photo with HBP student at Dataran Lang

 This photo is taken at Beras Basah Island

This is the rainbow motel that i feel so interesting.

 This photo is taken when i in the cable car at Gunung Mat Cincang

Happy taken picture with eagle at Dataran Lang

 The banner that our major design.

  This autograph is sign by all the HBP lecturer and the Dean.

The day attend the performance night and first time wear the baju kebaya.

The fish that stand by to put in to the pond on project 6.

 
The DiversOne gang ,we are happy family.

 After performance and award night,we take photo at Dk and that is very happy and enjoy.



Finally,we gather each other again in exhibition day and take the picture together and this will be the good memory for all the group member and we are the best.
We are come from construction management and we will together fight in the coming sem until the end.^^I appreciated you all .

Tuesday, November 26, 2013

Project 6b

In project 6b, we need to produce final report for our stage. In the report, it have introduction about our stage. Beside this , the background of study and site analysis have been shown.The required layout dimension for the amphitheater is 40m by 50m while for the stage ,the dimension should be not more than 4.0m x 6.0m x5.0m .For the soil,we notice that the type of soil is loam soil which is a mixture of soil that is the ideal plant-growing medium.It is actually a combination soil,normally equal parts of clay ,silt and sand. 
Moreover,we also have objective ,goals and metrics for our report. As my major is construction management,i have produce the project scheduling ,management plan,material selection and construction method.
For the construction method,our group propose the conventional method because it is traditional system that bring many of advantage.For the material selection,we use keruing to construct our roof , merbau as our floor and tempered glass as the partition of the roof and floor. For pilling,we use resak .In conclusion ,our group hope that audiences will be having a serene and close-to-nature feeling in experience with our Echo of sillence.
 tempered glass for partition of roof and floor

Keruing for roof

Project 6a

I am group 1 member in project 6 .Our project is an integrated project with task given to design and build the amphitheater stage beside the School of Housing,Building and Planning. After many brainstorming session among design team members,the design concept associated with the conical shell is come out. We names the amphitheater stage as Echo of Silence. The reason we give this name is because we want our audience to discover and feel in our unique ,comfortable and heartily designed amphitheater stage. For the stage,we decide to combined timber and glass as its main construction materials. 


 
All of this design is come out by our group design team members during the meeting session.

This is the site cross section and detail drawing produce by our design team members.

 In this paper,we produce the key plan ,site plan and location plan of our project.

 This picture is taken when i tracing the stage form our group presentation board

This photo is taken during our presentation session.

  This is our amphitheater stage look.

Project 5a and Project 5b


For my project 5a,it is about the neighbourhood elements existing condition.So, i decide use Bayan Residence as my place to do the research. I use scale 1:1000 to produce my drawing .



 In project 5a,we can draw some facility around the bayan residence .From my research, there have many facility such as cos-way, kinder garden,food court , playground and public telephone.
Beside that,in this project 5a, i also need to draw the key plan, location plan and site plan to let other can clearly know about my location.

Project 5a



This is project 5a that i have been process .From the legend,it show that bayan residence have three type of shop office that are 3-storey shop office (22' X 70') ,2-storey shop office (22' X 70') and 3-storey shop office (20' X 70') .For the house ,there have two type that are Edena ,3-storey terrace (type b) and Adalia,3-storey terrace (type a).


Project 5b



For project 5b,we need to do about neighborhood elements proposed improvement of Bayan Residence. At there,i detect that the road have dangerous without convex mirror.So,i think the corner of the road need to build one.
 Beside that,playground too bored because the facility is litter.So,for my suggestion,there should build more for the children.The area of Bayan Residence also lack of dustbin and the parking for OKU. So,there should set more so that can maintain the beauty of Bayan Residence.
Moreover,there have public open space near loji there.So i think there can build surau and Rukun Tertangga .Lastly,the lamp should build more so that the road can be bright to prevent thief have chance to enter the house .

Project 4

 For this project,we need to draw the plan evaluation ,front evaluation ,right evaluation ,left evaluation and rear evaluation of the L-shape chair in project 3b. Beside this ,we also need to draw the perspective drawing and axonometric drawing in second cartridge paper.
 I use scale 1:5 to process this drawing .
For this,i use isonometric drawing which is 30 degree and for perspective drawing,i use one point perspective to done it.